Module
Production Tracking
Follow material from request to stock and from stock to equipment.
Kitting
Material for a project is issued from stock against a material request line; who prepared it, qty and status are logged.
Project material management
All materials used on a project, with certificates, in the project material report.
Scrap tracking
Scrap from cutting is recorded separately; true consumption shows in reports.
Production reports
Production and consumption reports by stock type and project.
Malzeme
- Kalite
- P265GH
- Standart
- EN 10028-2
- Ölçü
- 8 × 1500 × 6000
- Sertifika
- EN 10204 3.2
- Heat No
- H-778104
Rezervasyonlar
- PRJ-1142
- 2,4 m² · Hava tankı
- PRJ-1188
- 1,1 m² · Reaktör
- Kalan
- 5,1 m²
Giriş muayenesi
- Girdi No
- MK-26-0866
- Tedarikçi
- Ege Metal Ltd.
- Sonuç
- Kabul
Stok hareketleri
- 03.09.2026
- Mal kabul · SİP-26-0509
- + 8,6 m²
- K. Öztürk
- 12.09.2026
- Rezervasyon · PRJ-1142
- 2,4 m²
- M. Yıldız
- 18.09.2026
- İş emri İE-2229 · kesim
- − 1,1 m²
- E. Aksoy
- 18.09.2026
- Fire kaydı
- − 0,62 m²
- E. Aksoy
About Production Tracking
How is short stock shown?
On-hand, reserved and remaining qty appear during kitting; a material request covers the shortfall.
Can we print pick lists?
Yes, kitting pick lists can be printed for the shop floor.
Posts about Production Tracking
- Material certificates and traceability: what to watch in stock trackingTracking EN 10204 3.1 and 3.2 certified material from receipt to project; how stock records should work in pressure equipment and steel fabrication.2 min read
- What should machine manufacturers look for when choosing an ERP?ERP selection criteria for make-to-order machine and process equipment makers: certified material, quote-to-production chain, project labor and phased rollout.2 min read
Modules that work together
Quote Management
Every RFQ’s bid decision, design work, technical and commercial status and due date in one list.
ExploreProject Tracking
Each piece of equipment’s deadline, PED/ASME scope, revisions, labor hours and owners on one project record.
ExploreStock Tracking
Which certified material went to which equipment, what’s left in stock and what’s reserved, tracked record by record.
ExplorePurchasing
From material request to PO, receiving to incoming QC: one flow keyed by project number.
ExploreShipments
When the project ships, in which crates, by which route and with whom, in one record from preparation to delivery.
ExploreAccounts
Domestic and international customers and suppliers together with their quotes, projects and orders.
ExploreMaterial Planning
Material demand of the selected projects, with where each item will come from and the stage it is in today.
ExploreSubcontracting
Work sent out and taken in is tracked by project number and tied to the quality plan.
ExploreNonconformance and CAPA
Every nonconformance is recorded with its source, severity and batch, and followed through to root cause and verified corrective action.
ExploreEquipment and Maintenance
The status of machines, instruments and hand tools comes from their maintenance records; faults, maintenance and calibration share one history.
ExploreProcess Times and Gantt
How long each step from request to production really takes, and how well suppliers keep their dates, measured from the dates in your records.
ExploreManufacturing Finance
Production cost and invoice data are processed and the official entries handed to your accounting software. Optional module, not part of the default installation.
ExploreLet’s walk through the screens
In a screen share we walk quote, project and stock screens on one of your own projects. No install needed.