Skip to content

ERP for machine & equipment manufacturers

Make-to-order manufacturing, traceable end to end.

Quotes, projects, certified materials, purchasing and kitting — side by side in windows. İnsya ERP is built for make-to-order makers of pressure vessels, tanks, exchangers and machines.

Welder working on a flanged pipe body

Who it’s for

Make-to-order equipment manufacturers

For makers where every project has its own quote, drawing, materials and quality file. Developed on ASME and PED shop floors, from inside that work.

Pressure vessels and tanks

Hold points, inspector acceptance and the MTR trail, in the order ASME and PED work expects.

Heat exchangers

Tube, tube-sheet and shell materials tracked with certificates.

Reactors and columns

Design calc, specs and drawing revisions on the project.

Machines and conveyors

BOM, purchasing and kitting in one flow.

Steel structures

Profiles and plate cuts with scrap and reservations.

Skids and packaged units

Multi-discipline materials and deadlines tracked under one project.

Highlight

One PDF instead of weeks of quality-file prep

On the material incoming report, certificates, heat numbers, project and job-prep numbers and drawing positions come from the records automatically. The signed report downloads as a single file with all attachments.

Material incoming report
Girdi paneli: seçilen proje, malzeme ve iş emirlerinden sertifika ve pozisyonlar otomatik toplanır; ekleriyle tek PDF

New

Featured capabilities

From the technical office to purchasing, from quality to manufacturing cost: recent capabilities accelerating operations and minimising human error across the factory.

İnsya AI assistant integration

İnsya AI via MCP

The İnsya AI assistant connects to the ERP on your behalf, with your own permissions: project deadlines, stock, material requests, purchasing, subcontracting, shipments, quality and maintenance status can be queried, and material requests created in natural language.

  • MCP
  • OAuth 2.1
Details

Subcontracted work

Subcontracting

Work you send out or take in is tracked under your own project number: a simple three-step flow or a detailed, quality-planned one.

  • ISO 9001 8.4
  • EN 1090 / ISO 3834
  • ASME
Details

Bill of materials from drawings

Drawing-to-BOM with İnsya AI

The parts list and title block are read with İnsya AI; rows are checked by the technical office before they become material requests.

  • DXF
  • DWG
  • PDF
  • BOM
Details

Material planning

Material Planning

Every material request of the selected projects in one list: whether each item comes from stock or from a PO, and where it stands today.

  • Lead time
Details

Purchase order letter

Purchase Order

The formal order to the supplier, built from approved quotes, with an approval flow, revision archive and supplier confirmation.

  • Incoterms 2020
  • EN 10204
Details

Nonconformance and CAPA

NCR & CAPA

Nonconformances are opened in 8D form and followed through root cause and corrective action; closing conditions are listed on screen.

  • ISO 9001 8.7 / 10.2
  • EN 1090 / ISO 3834
  • 8D
  • ASME
Details

Process times and Gantt

Lead time & on-time delivery

How long each step from request to production really takes, and how well suppliers keep their dates, measured from the dates in your records.

  • Lead time
  • OTD
Details

Shipments

Shipment management

When the project ships, in which crates, by which route and with whom, in one record; a project shipped in parts gets one shipment per lot.

  • Incoterms 2020
  • Packing list
Details

Manufacturing finance

Manufacturing cost & invoicing

Manages real manufacturing costs, progress billing, and invoice matching; seamlessly exports approved official records to your accounting software. Optional module.

  • Optional
  • UBL-TR
  • Three-way match
Details

Labour hours

Time reporting & labour hours

Who worked how many hours, on which day, on which project and on which operation is recorded day by day; approved hours reach project cost at the person’s position rate.

  • Timesheet
  • Direct / indirect labour
Details

Support tickets and consent-based remote assistance

Help desk & remote assistance

Issues are reported from inside the ERP; when needed, the support team helps by seeing the screen, with the user’s consent.

  • WebRTC
Details

Role-based permissions and uninterrupted data flow

Role-based access & performance

A permission matrix ensuring operational security alongside smooth, instant data listing.

Details

All new features

One flow

An unbroken record from quote to kitting

Won quotes become projects; project needs become POs; received goods go through incoming QC into stock; stock feeds kitting.

  1. 01QuoteTechnical and commercial review
  2. 02ProjectDeadline, design, drawings
  3. 03PurchasingRequest, PO, reject review
  4. 04Incoming QCReceiving and incoming inspection
  5. 05StockReservation, certificate, location
  6. 06KittingMaterial from stock to project

Desktop UI

Don’t get lost in tabs

Open several records at once, compare them, navigate with the keyboard. Each feature has its screen beside the text.

Ana ekran: modül ikonları, Operasyon Kokpiti, Malzeme & Üretim Akışı ve operasyon notu

Modules

Meet the modules with their screens

Each module works alone; when opened together, records stay linked.

Quote Management

Every RFQ’s bid decision, design work, technical and commercial status and due date in one list.

  • RFQ and revisions. Customer request no, RFQ reference and revision, page count on the quote record.
  • Bid and design decision. “Should we quote?” and “Should we design?” plus design calculation status in separate fields.
  • Technical and commercial flow. Technical and commercial quote statuses tracked separately; engineer and sender are clear.
Quote Management screens
Teklif Takip: öncelik, teknik ve ticari teklif durumu, kalan gün

Project Tracking

Each piece of equipment’s deadline, PED/ASME scope, revisions, labor hours and owners on one project record.

  • PED and ASME scope. Projects are flagged with PED and ASME fields; the list filters by those scopes.
  • Revision tracking. Design, drawings and specs on the project; drawing and manufacturing form revision totals as columns.
  • Labor hours. Planned labor vs actual regular and overtime hours; variance in its own column.
Project Tracking screens
Proje Takip: durum sekmeleri, kayıtlı görünümler, termine ≤30 gün uyarısı

Stock Tracking

Which certified material went to which equipment, what’s left in stock and what’s reserved, tracked record by record.

  • Type-specific cards. Cut-to-size, piece and kg types with their own fields: grade, diameter, standard, paint and dimensions.
  • Certificate and incoming. Material certificate, incoming inspection and “PED?” on the stock item.
  • Reservation and scrap. Qty reserved for a project, offcuts and scrap separately; reports by stock type.
Stock Tracking screens
Stok Takip: malzeme türleri gruplar halinde, son açılanlar ve durum süzgeci
Dikişsiz boru: çap, kalite, heat no, sertifika, kalan boy ve rezervasyon; açık satırda kesim geçmişi

Purchasing

From material request to PO, receiving to incoming QC: one flow keyed by project number.

  • Material requests. Project requests with requester and project number; the link stays when turned into a PO.
  • Receiving and incoming. Arriving goods are recorded at receiving and booked to stock with an incoming QC report.
  • Reject review. Warehouse and QC rejects in separate queues with count badges.
Purchasing screens
Satınalma siparişleri ve depo / kalite kontrol ret değerlendirmesi

Production Tracking

Follow material from request to stock and from stock to equipment.

  • Kitting. Material for a project is issued from stock against a material request line; who prepared it, qty and status are logged.
  • Project material management. All materials used on a project, with certificates, in the project material report.
  • Scrap tracking. Scrap from cutting is recorded separately; true consumption shows in reports.
Production Tracking screens
İş Hazırlama: projeye stoktan verilen malzemeler ve durumları

Shipments

When the project ships, in which crates, by which route and with whom, in one record from preparation to delivery.

  • Partial shipments and crates. A project can ship in several lots; each crate keeps its dimensions, gross and net weight and contents, and the packing list is built from them.
  • Multi-leg routes. Factory to port by truck, port to destination by ship: each leg has its own carrier, dates, tracking number and payer (us, rebilled to the customer, or the customer).
  • Freight and insurance quotes. Freight, insurance, customs, port and crane quotes with currency and validity; the selected quote’s company is written to the leg or the insurance. Amounts are visible only to authorised users.
Shipments screens
Sevkiyatlar: projeye bağlı partiler, teslim şekli, hazırlık listesi ve sevk adımı

Accounts

Domestic and international customers and suppliers together with their quotes, projects and orders.

  • Account cards. Address, contact and authority details; customer vs supplier.
  • Linked records. A customer’s quotes and projects, a supplier’s POs and receipts under the same account.
  • Contact directory. People at each company with role and contact details in a shared directory.
Accounts screens
Müşteriler: il, OSB adresi, yetkili, açık proje ve teklif sayısı

Material Planning

Material demand of the selected projects, with where each item will come from and the stage it is in today.

  • Demand by project. Select one or more projects; their material requests are gathered line by line in one list.
  • Supply source. Each line is marked as covered from stock or from a PO; lines covered from stock show as a warning in purchasing.
  • Stage bar. Request, purchasing, receiving, stock-in and kitting on every row; late items stand out.
Material Planning screens
Malzeme Planlama: seçilen projelerin talepleri, tedarik yeri ve aşama çubuğu

Subcontracting

Work sent out and taken in is tracked by project number and tied to the quality plan.

  • Both directions, one structure. Work sent to subcontractors and toll work from customers follow the same record structure, labelled by direction.
  • ITP and hold points. For ASME / PED work, steps from cutting to pressure test; the next step cannot be recorded until quality signs off.
  • Document requirements. The job cannot close until required documents such as WPS, WPQ, MTR and NDE reports are in; status is derived from the steps.
Subcontracting screens
Fason İşler: verilen ve alınan işler, ITP adımları ve bekleme noktaları

Nonconformance and CAPA

Every nonconformance is recorded with its source, severity and batch, and followed through to root cause and verified corrective action.

  • 8D structure. Description, containment, root cause (5 Whys, fishbone), disposition, corrective action and verification.
  • Traceable record. Batch / heat no, drawing no and revision on the record; every change kept in a non-deletable audit trail.
  • Closing conditions. ASME-scope records cannot close without Authorized Inspector acceptance, nor repairs without a new NDE result.
Nonconformance and CAPA screens
Uygunsuzluk ve DÖF: kaynak, önem, 8D adımı ve kapanış durumu

Equipment and Maintenance

The status of machines, instruments and hand tools comes from their maintenance records; faults, maintenance and calibration share one history.

  • Fault reporting. Operators report with three fields: equipment, what happened, and whether production stopped; the maintenance owner is notified.
  • Planned maintenance and calibration. Maintenance plans by interval in days; upcoming and overdue work stand out, and certificate expiry is tracked.
  • Status from records. A fault sets Faulty, a service visit sets In service; status is never picked by hand. Downtime is calculated from the record.
Equipment and Maintenance screens
Ekipmanlar: bakım kayıtlarından türeyen durum ve sonraki planlı bakım

Process Times and Gantt

How long each step from request to production really takes, and how well suppliers keep their dates, measured from the dates in your records.

  • Step durations. Median and 80th-percentile time between request, PO, receiving, stock and kitting; where the time goes in one bar.
  • Supplier performance. On-time delivery rate and average delay per supplier.
  • Waiting work. Which step each item not yet released to production is in, and for how many days.
Process Times and Gantt screens
Süreç Süreleri: adım bazında medyan ve %80 süre, tedarikçi zamanında teslim oranı

Manufacturing Finance

Production cost and invoice data are processed and the official entries handed to your accounting software. Optional module, not part of the default installation.

  • Three-way match. Incoming e-invoice XML (UBL-TR) is matched against the PO and goods receipt; quantity and price differences stand out.
  • Project cost. Material, labour and direct expenses; actual, committed and budget on one bar.
  • Sales billing plan. Advance, milestone and progress billing; whoever marks a line as earned cannot approve it.
Manufacturing Finance screens
Gelen faturalar: sipariş ve mal kabulle üçlü eşleştirme, muhasebe aktarım durumu

Built for busy teams

Role-based access

Access is set per module and section; everyone only sees their work.

Edit history

Who changed what and when — every record change is traceable.

Notification center

Projects near deadline and pending requests collect under the bell.

Workspaces

Save your open window layout by name; resume in the same layout the next day.

No install

No server setup; open it from the office, shop floor or field in a browser.

Multilingual

UI in Turkish, English and Arabic so mixed teams share one system.

Common questions

How can I see İnsya ERP?

Fill in the demo request form or call us. In a screen share we walk through the screens on one of your own projects.

What happens after the demo?

After your team reviews, we open an account for your company and plan the import of stock and account lists together.

Do we need special training?

The UI uses windows, a taskbar and a single search box; teams pick it up quickly. We give a short kickoff walkthrough.

Is İnsya ERP an accounting program?

No. It manages production, stock, projects and purchasing; official accounting and invoicing stay in your accounting software. Invoice and expense modules can be added if you need them.

How do I get support?

Email us or call on weekdays 10:00–17:00.

Can it be used for ASME work?

Yes. İnsya ERP was developed on ASME and PED shop floors: hold and witness points, Authorized Inspector acceptance, MTR and heat-number traceability, WPS / WPQ / NDE documents each have their place in the records.

DEMO REQUEST

See İnsya ERP on your process

Ekran paylaşımında kendi bir projeniz üzerinden teklif, proje ve stok ekranlarını birlikte gezelim. Kurulum gerekmez.