Skip to content

Module

Nonconformance and CAPA

Every nonconformance is recorded with its source, severity and batch, and followed through to root cause and verified corrective action.

8D structure

Description, containment, root cause (5 Whys, fishbone), disposition, corrective action and verification.

Traceable record

Batch / heat no, drawing no and revision on the record; every change kept in a non-deletable audit trail.

Closing conditions

ASME-scope records cannot close without Authorized Inspector acceptance, nor repairs without a new NDE result.

NCR report

Signed Turkish / English report with photo, NDE report and material certificate attachments.

Uygunsuzluk ve DÖF: kaynak, önem, 8D adımı ve kapanış durumu

About Nonconformance and CAPA

Are CAPA owners and due dates tracked?

Yes. Each corrective and preventive action has an owner and due date; overdue actions stand out in the list.

Can the person who opened a record close it?

No. Open, edit and approve rights are separate; nobody approves their own work.

Modules that work together

Quote Management

Every RFQ’s bid decision, design work, technical and commercial status and due date in one list.

Explore

Project Tracking

Each piece of equipment’s deadline, PED/ASME scope, revisions, labor hours and owners on one project record.

Explore

Stock Tracking

Which certified material went to which equipment, what’s left in stock and what’s reserved, tracked record by record.

Explore

Purchasing

From material request to PO, receiving to incoming QC: one flow keyed by project number.

Explore

Production Tracking

Follow material from request to stock and from stock to equipment.

Explore

Shipments

When the project ships, in which crates, by which route and with whom, in one record from preparation to delivery.

Explore

Accounts

Domestic and international customers and suppliers together with their quotes, projects and orders.

Explore

Material Planning

Material demand of the selected projects, with where each item will come from and the stage it is in today.

Explore

Subcontracting

Work sent out and taken in is tracked by project number and tied to the quality plan.

Explore

Equipment and Maintenance

The status of machines, instruments and hand tools comes from their maintenance records; faults, maintenance and calibration share one history.

Explore

Process Times and Gantt

How long each step from request to production really takes, and how well suppliers keep their dates, measured from the dates in your records.

Explore

Manufacturing Finance

Production cost and invoice data are processed and the official entries handed to your accounting software. Optional module, not part of the default installation.

Explore
DEMO REQUEST

Let’s walk through the screens

In a screen share we walk quote, project and stock screens on one of your own projects. No install needed.